Sigenergy inverters and storage on one stack, with a short history

Sigenergy designs the inverter, the battery, the controls and the islanding gateway as one product rather than four purchases. The engineering is genuinely good and the company was founded in 2022, which means its warranty terms outlast its entire existence so far. We specify it where the integration earns its place, and we underwrite the product rather than the corporate record.

  • Capacity bought in 12 kWh steps
  • Gateway islands a defined backup load
  • Over 50 kWp, outside MCS
  • 2022 Year the company was founded
  • China Where the equipment is made
  • Inverters and storage What it supplies to us
  • 12.06 kWh The step the battery grows in

The most tightly integrated storage platform we specify, and the shortest corporate history behind one.

Sigenergy is the youngest manufacturer on our list by a wide margin, and it makes the most tightly integrated product on it. Both of those facts are true at once, and a page that only tells you one of them is selling rather than specifying.

The engineering case is real. Capacity that is bought by the module instead of by the cabinet changes how a site can phase its capital, and a gateway that genuinely opens the breaker and carries a defined load through an outage is a different proposition from a battery that simply stores cheap energy. The finance case is the harder half, and it is where this page starts.

01 Bankability

A company younger than the warranties it writes

Start with the arithmetic, because it is the whole assessment. Sigenergy was founded in 2022. A product warranty issued this year runs into the middle of the next decade. No Sigenergy product has yet run for as long as its own warranty term, and none can have done, because the term is longer than the company. A lender asking for a track record across a warranty period is asking for something that does not exist yet, and no amount of framing changes that.

What does exist is worth stating precisely. The founding team came largely from Huawei's digital-power business, so the engineering pedigree behind the product is considerably older than the company that sells it. It is well funded, it scaled into UK distribution quickly, and the M1 inverters are held in British distribution rather than quoted on a lead time. On the storage side we confirm IEC 62619, the safety standard for secondary lithium cells in industrial use, and IEC 62477-1 for the power conversion equipment, alongside the IEC 62933 framework for the system as a whole, for the exact product before contract. The stated ten-year product warranty on the M1 inverters is verified in writing per project, including any connectivity conditions attached to it and any extension options, together with the UK spares and service path. That is what we can stand behind, so that is what we put in front of a finance director rather than a standing the maker has not earned.

  • 2022 Year the company was founded Younger than the warranty terms it issues
  • IEC 62619 Industrial lithium cell safety standard With IEC 62477-1 on the power conversion equipment
  • 10 years Stated product warranty on the M1 inverters Verified in writing per project, connectivity conditions included
  • None Independent assessment of this maker No survey covers a company this new, and we claim none
02 The full range

A string inverter line, and a battery that is bought by the module

Inverters

Three-phase commercial PV string inverters, 50 to 125 kW

A modern string platform with a high tracker count for its rating, which suits a roof carrying several orientations under one connection. Arc-fault detection is inside the enclosure rather than added as a separate DC box, and the family runs on above the 100 kW unit to 125 kW.

  • Sigen PV 50M1-HYA
  • Sigen PV 80M1-HYA
  • Sigen PV 100M1-HYA
  • Peak efficiency: Up to around 98.6%
  • MPP trackers: 4 at 50 kW, 6 at 80 kW, 8 at 100 kW
  • Enclosure: IP66 with integrated arc-fault detection
  • Stated warranty: 10 years, verified in writing per project

This is a young product line that revises quickly, so we specify against the issued datasheet and firmware revision for the exact unit the distributor supplies rather than a family-level page.

Battery storage

Modular LFP stacks and a grid-islanding gateway

Capacity is bought in 12 kWh steps rather than as a fixed cabinet, so a site installs what its present load justifies and adds modules when a process or a tariff changes. The Gateway is a separate device that disconnects the site from the network and runs a defined backup load through an outage.

  • SigenStack
  • SigenStor
  • Sigen Gateway C120 to C1200
  • Sigen Energy Controller
  • Module step: 12.06 kWh per LFP module
  • Cell: 314 Ah lithium iron phosphate
  • Range per inverter: Around 48 to 253 kWh
  • Cycle rating: 10,000 cycles at cell level, 0.5C, to 60% state of health
  • Gateway: Three-phase, roughly 120 to 1200 kW

Ten thousand cycles is a cell-level figure measured at 0.5C, which is a laboratory duty rather than a site duty. The warranted system figure is the one that matters commercially and we read it off the issued warranty document.

Datasheet figures only. We publish no price, and the exact model is confirmed against the design and the current datasheet before order.

03 Why one product line

What designing the stack as one thing actually buys

Integration is claimed by nearly every maker and delivered by very few. On a Sigenergy site it means three specific things, each of which shows up at commissioning rather than in a brochure.

One set of controls

The energy management that decides whether to charge from the array, charge from the grid, hold for backup or discharge against a demand peak is the same software that runs the inverter. There is no third-party controller to configure and nobody to blame at the interface when the dispatch is wrong.

A battery bought by the module

Capacity moves in 12.06 kWh steps on the inverter already fitted, so the first phase does not have to be over-bought to cover a load that may never arrive. Adding capacity later is an addition rather than a rebuild.

A gateway that opens the breaker

The Gateway sits between the incoming supply and the protected circuits, watches the network and disconnects the site when the grid fails. Backup stops being a claim about the battery and becomes a device with a rating you can size.

04 Granularity

The numbers that make the modular argument

These are the figures that decide whether a phased plan is possible, and they are the reason a Sigenergy design is sized differently from a cabinet-based one.

  • 12.06 kWh The smallest capacity that can be bought One module, and the step the whole platform is built on
  • 48 to 253 kWh Span on a single M1 inverter Four modules to twenty-one, with the inverter unchanged
  • 120 to 1200 kW Gateway sizes, C120 through C1200 Backup is rated separately from the battery, and sized separately
05 Backup, engineered

Islanding is a scoped decision, not a feature you switch on The critical load sets the power. The run-time sets the energy. They are two different questions and they price very differently.

The Gateway is the part of the Sigenergy range that changes an engineering conversation, and it is also the part most often specified badly. When the grid fails, the Gateway disconnects the site from the network and keeps a defined set of circuits running from the battery and whatever the array is producing. The words that do the work in that sentence are a defined set of circuits.

So the design starts with a walk round the building and a list. Which boards must stay live, and for how long. A cold store that has to hold temperature through a four-hour outage is a completely different system from a site that only needs to ride through a short dip without dropping a production run, and a server room with an orderly shutdown requirement is a third answer again. The critical load in kilowatts sets the Gateway rating and the inverter that has to carry it. The run-time in hours sets how many 12 kWh modules the battery needs. Scope both generously and the system is over-bought; scope them vaguely and the site discovers at the first outage that the wrong board was on the protected side.

That scoping is also where the honest limits get set. Islanding is not the same as an uninterruptible supply, the transfer is not instantaneous in the way a static switch is, and anything that genuinely cannot see a break still needs its own protection ahead of the Gateway. We write those boundaries into the design rather than leaving them to be discovered. What a battery is being asked to do, backup included, is set out on our backup power page, and how the store is sized against a half-hourly load on the sizing page.

07 Sizing method

How a SigenStack is sized, and then grown

  1. Read

    Half-hourly load, not a nameplate

    We start from twelve months of half-hourly consumption and the tariff behind it, so the store is sized against the peaks and the price shape the site actually has. A battery sized from an annual kilowatt-hour total is a battery sized from the wrong number.

    Before design

  2. Scope

    Decide what has to survive an outage

    The protected circuits are agreed on site and written down. That list sets the Gateway rating in kilowatts and the run-time sets the module count, and both are held separately from the savings case so neither is quietly funding the other.

    At survey

  3. Set

    Fix the first stack, and leave the headroom

    The opening configuration covers the load and the resilience the site has today, on an M1 inverter with room above it. We record what the stack can grow to, so a later expansion is a purchase order rather than a redesign.

    At design

  4. Grow

    Add modules when the load moves

    A new process, a fleet of chargers or a tariff change is met by adding 12 kWh modules to the existing stack on the existing inverter and controls. We re-model against the current half-hourly data first, because growth that is not in the load data is a guess.

    Whenever the site changes

Almost everything good and everything risky about Sigenergy comes from the same decision: to build the inverter, the battery, the controls and the backup device as one product line instead of four. That is worth reading in both directions before it reaches a drawing.

08 Honest placement

Where the integrated stack is worth it, and where it is a liability

Specify

Where it fits

  • Sites that want resilience as well as savings, because the Gateway is a real islanding device rather than a marketing claim about backup.
  • A phased capital plan, because the battery grows in 12 kWh steps on the inverter that is already installed.
  • Schemes where a single vendor across generation, storage, dispatch and metering removes the interface arguments at commissioning.
  • Roofs with several orientations under one connection, where the M1 tracker count lets the strings be grouped cleanly.
Specify something else

Where it does not

  • A project underwritten on the manufacturer's corporate history, because there are only a few years of it and we will not dress that up.
  • Sites that need second-sourcing, since a single-vendor stack makes spares, firmware and support a single-vendor dependency for the life of the asset.
  • Large uniform ground-mount, where nothing about the platform earns its keep: there is no phased load to grow a modular battery into and no critical circuit to island.
  • Estates already standardised on another monitoring platform, where adding a second vendor ecosystem costs more in operations than the integration saves.
09 FAQ

Sigenergy on a commercial roof: common questions

Because a short corporate history and a weak product are different things, and only one of them is true here. The founding team came largely from Huawei's digital-power business, the funding is serious, the M1 inverters are in UK stock and the storage platform does something the alternatives do not. What we will not do is turn any of that into a bankability claim. Where a credit committee is effectively buying the manufacturer's history, we recommend a longer-established maker instead. Where it rests on the asset, we specify Sigenergy and confirm the certification, the warranty conditions and the UK service route in writing before contract.

No, and the distinction matters commercially. Ten thousand cycles to 60% state of health is a cell-level figure measured at 0.5C in laboratory conditions. Your site will not discharge at a constant 0.5C, will not sit at a laboratory temperature and will not cycle in a clean daily pattern. The commercial number is whatever the issued warranty document guarantees, in years, throughput or retained capacity, for the system rather than the cell. We read that document for the exact product before contract and quote from it, not from the cycle headline.

It disconnects the site from the network and keeps a defined set of circuits running from the battery and any solar, then reconnects when the grid returns. It is a real device with a rating, supplied three-phase from roughly 120 kW to 1200 kW across the C120 to C1200 sizes, and it is sized against the load you decide must stay live rather than against the whole building. Islanding is not the same as an uninterruptible supply, so anything that cannot tolerate any break at all still needs its own protection ahead of it. We agree the protected circuits on site and write them into the design.

Yes, and it is the main practical reason to choose this platform. Capacity moves in 12.06 kWh module steps on the M1 inverter already installed, from roughly 48 kWh at four modules up to around 253 kWh at twenty-one. So the first phase can be sized to the load the site has now, with the growth path recorded rather than paid for. Before any expansion we re-model against the current half-hourly data, because a load increase that has not shown up in the meter data is a forecast rather than a fact.

In practice yes, and that is the trade-off the whole platform is built on. The controls, the dispatch logic, the monitoring and the warranty run across the stack as one product, which is what removes the interface problems at commissioning and also what removes your second source afterwards. On a site that is already standardised on another monitoring platform, or where the operations team needs to keep spares common across an estate, that concentration can cost more than the integration saves. We will say so when it does.

Plan in months rather than weeks, and expect the grid rather than the hardware to set the pace. The G99 application to your network operator has to be assessed before a firm installation date exists, and that timescale sits with them. We start it early and run the design alongside it. Once the connection position and the design are settled, a modular stack and its M1 inverter install inside a defined window. The connection critical path is explained in our grid connection queue guide.

Get a commercial quote

The equipment is chosen to fit the design, not the other way round.

Tell us about the roof and the load. We survey the site, model the array in PV*SOL against your half-hourly data, and specify what actually fits, with the manufacturer, the series and the warranty named. Sigenergy goes on the roof where it is the right answer and not because it is on a list.

  • On-site 3D drone survey and half-hourly PV*SOL model
  • We confirm your DNO and handle the G99 connection
  • Over 50 kWp, outside MCS